Cast Iron Stoves, Ultralight Aircraft, Snow Groomers, Rubber Bands still

Season 21 · Episode 11

Cast Iron Stoves, Ultralight Aircraft, Snow Groomers, Rubber Bands

  • Release date
  • June 13, 2013
  • Runtime
  • 21 min
  • TMDB score
  • 10

Molten iron is poured into moulds, cleaned and finished before the heavy castings are assembled into wood-burning stoves. Lightweight structural components are joined into ultralight aircraft; tracked chassis, hydraulic systems and grooming equipment are combined into machines that maintain snow-covered trails; and cured rubber tubes are sliced into individual rubber bands.

Community

–
No ratings 0 likes

Episode reviews

No reviews for this episode yet.