Season 36 · Episode 2
Charlestown 2014: Part 2: Brick Rowhouse Blues
A fix for a major problem: exterior walls that are bowing outward. Two weeks of work in the basement, meanwhile, has lowered the floor by several inches; the radiant heat-insulation system is installed; and it's shown how the roof is under-structured. In other events, Norm revisits a Charlestown townhouse featured on the show 14 years ago.
Community
–
No ratings 0 likes
Log in to rate episodes.
Episode reviews
No reviews for this episode yet.