Critical Path poster

Critical Path

The engineering journey to Starship and beyond.

No ratings yet. Be the first to rate.

Critical Path — Plot

Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.

  • Release date
  • July 10, 2026
  • Runtime
  • 34 min

Log in to rate, list, and review this title.

Log in Sign up

Critical Path — Cast

Community rating

–
0 ratings

Rating distribution

No ratings yet. Be the first to rate.

  • 0 watched
  • 0 watching
  • 0 watchlist
  • 0 dropped
  • 0 likes

Characters

Rate the cast one by one. The best-loved character is the community’s call.

Sign in to rate characters.

Where to watch

No provider data for this region.

Reviews

No reviews yet.

Similar Films

If you liked Critical Path, these are worth a look.